Strategic Goals & Objectives

Newport Vision 2040 logo

Department Goals

Engineering (2023-24)
Goal# Goal Title Goal Type Goal Progress Goal Text Status Updates V2040 Strategies Objectives  
1 Provide Resilient Water Supply and Distribution to Residents Ongoing In Process E1 
718 Design and build a replacement Dam on Big Creek. (see Objective 547) In Process
719 Install resilient HDPE transmission main through City as seismic proof backbone of the Citys water system In Process
720 Construct redundant underbay crossing (see Objective 552) In Process
721 Develop water system master plan and update on regular cycle (5-year) to guide short- and long-term planning and project development for the Citys water system. (see Objective 639) In Process
 
2 Improve Engineering/PW Shops Workspace Environment (See Goal 38) Ongoing Not Started F7 
722 Develop City-wide master plan for all city owned Facilities Not Started
723 Upgrade PW Shops and office space. Shift Engineering Department to PW facility to facilitate coordination and create space in City Hall. Not Started
 
3 Manage Comprehensive Capital Improvement Program Ongoing In Process 2023-24: A Sanitary Sewer Master Plan was initiated by Public Works (with Engineering supporting) and is anticipated to be complete in early 2023. A request for proposals (RFP) is underway for the Water Master Plan, targeted for advertisement in December, anticipated award early 2023. A stormwater master plan request was not funded in 2022/23 adopted budget. It is recommended that master plans be initiated for all major infrastructure systems (such as water, storm, sanitary collections and treatment, roads, and facilities) and updated regularly. Master plan updates on a 5-year cycle can reduce the cost of each update by maintaining the plans and reducing the time between updates. The master plans can also become the major source of a Capital Improvement Program (CIP) for the City that can have a rolling 5-year outlook for capital projects, greatly simplifying the budget process and allowing for better long-range prioritization of projects. A1 
724 Establish and maintain an overall master planning approach to infrastructure systems (water, storm sewer, sanitary sewer, roads) and maintain current (5-years or newer) plans to guide the Citys capital improvement processes. In Process
725 Update Stormwater Master Plan with comprehensive model in GIS. In Process